Great Life Comes With Great Neighbourhood And GLOBAL Serene Promises Exactly That !
Global Serene is a cosy haven away from the deafening sounds of traffic and pollution, Yet magically situated very near to main road with 3 BHK homes carefully planned as per vastu. It is wonderfully located in close proximity to a number of reputed Schools such as (SSM,Alwin,ZIon,Bharath Vidyashram ),a train station at Tambaram (just 5kms away) and is just twenty five minutes from the Chennai International Airport.
Global Serene Boasts a Copious Supply of underground water with Automatic motor, A four passenger Automatic Lift, Automatic Generator for 24/7 Power Back-UP , 24/7 intergrated CCTV with mobile and a Spacious Independent Covered Car Parking
Come experience a whole new lifestyle at Global Serene where instant bliss is for your taking!
GLOBAL SERENE Plot No: 143, Bhuvaneshwari Nagar, Madambakkam, Chennai - 600 126, Madambakkam, Selaiyur.
| Floor | Flat No | Rooms | Main Door | UDS Sq. Ft. | Flat Area Sq.Ft. | Status |
|---|---|---|---|---|---|---|
| First | F1 | 3 BHK | North | 525 | 1191 | B |
| F2 | 3 BHK | North | 525 | 1191 | B | |
| Second | S1 | 3 BHK | North | 525 | 1191 | B |
| S2 | 3 BHK | North | 525 | 1191 | B | |
| Third | T1 | 3 BHK | North | 525 | 1191 | B |
| T2 | 3 BHK | North | 525 | 1191 | B | |
| 3,150 | 7,146 |
Plot No: 143, Bhuvaneshwari Nagar, Madambakkam, Chennai - 600126.
A – AVAILABLE B – BOOKED
|
DOORS WINDOWS VENTILATORS |
|
|
LIVING DINING BED ROOMS CAR PARKING
|
|
|
FLOORING PLATFORM SINK LOFT SHELVES |
|
|
FLOORING WALLS |
|
|
FLOORING RAILING |
|
|
EWC IWC WASH BASIN |
|
|
SUMP OHT SEPTIC TANK BATH ROOMS KITCHEN SINK PARKING AREA |
|
|
INTERNAL EXTERNAL DOORS WINDOWS GRILLS |
|
All Wardrobes / Cupboards, Showcases & Shelves in all the rooms shall be provided with both sides polished Black Coloured Cudappa slabs to a maximum of 45 Sq. Ft. in 2BHK Flats & 60 Sq. Ft. in 3BHK Flats ( If any Additional quantity required beyond the provision will be charged Extra)
| ENTRANCE |
|
| DRAWING |
|
| DINING |
|
| ALL BED ROOMS |
|
| KITCHEN |
|
| ATTACHED TOILETS |
|
| COMMON TOILET & OUTSIDE WASH BASIN |
|
| SERVICE AREA |
|
| COMMON POINTS |
|
| SWITCHES & WIRES |
|
| ALL BED ROOMS |
|
| APT |
|
| CCP |
|
| BHK |
|
| UDS |
|
| RCC |
|
| CM |
|
| M.S |
|
| CP FITTINGS |
|
| CPVC PIPES |
|
| UPVC PIPES |
|
| S.W.R PIPES |
|
| FRP |
|
| PVC |
|
| EWC |
|
| IWC |
|
| ELCB |
|
| MCB |
|
| A |
|
| CMDA |
|
| CMWSSB |
|
| S.No. | Stages of work | Percentage |
|---|---|---|
| 1 | While entering into Agreement | 20% |
| 2 | While Registration of UDS of Land / Plot | 30% |
| 3 | When Foundation work commenced | 10% |
| 4 | When RCC roof slab of Stilt Floor / GF of house is laid | 10% |
| 5 | When RCC roof slab of respective Floor is laid | 10% |
| 6 | When Brick Work in respective Flat / House is commenced | 10% |
| 7 | When Painting Work in respective Flat / house is commenced | 5% |
| 8 | When flooring in respective Flat / house is commenced | 5% |