Global Orchid is a Corner Property in a Posh Location at Rajakilpakkam, Sporting 30 feet wide roads which is sandwiched between 2 reputed schools (Kendriya Vidhyalaya & Sankara Vidhyalaya), All within 400 meters from the site.
Global Orchid Boasts 100 percent Vastu complaint 2 and 3 BHK units, A Six passenger Lift, 24/7 intergrated CCTV with mobile and a Spacious Covered Car Parking with Independent Gates
Come experience a whole new lifestyle at Global Orchid where your cherished happiness is just a step away!
Global Orchid No.19 &20, 3rd Street, Saraswathi Nagar, Rajakilpakkam, Chennai, TamilNadu, India., Rajakilpakkam.
| Floor | Flat No | Rooms | Main Door | UDS Sq. Ft. | Flat Area Sq.Ft. | Status |
|---|---|---|---|---|---|---|
| Ground | G1 | 3 BHK | South | 535.1 | 1148 | B |
| First | F1 | 2 BHK | North | 421 | 905 | B |
| F2 | 2 BHK | North | 417 | 895 | B | |
| F3 | 2 BHK | South | 438 | 940 | B | |
| F4 | 2 BHK | South | 438 | 940 | B | |
| Second | S1 | 3 BHK | North | 650 | 1394+PT | B |
| S2 | 2 BHK | North | 417 | 895 | B | |
| S3 | 2 BHK | South | 442.9 | 950+PT |
B |
|
| 3,759.00 | 8,067.00 |
No.19 &20, 3rd Street, Saraswathi Nagar, Rajakilpakkam, Chennai, TamilNadu, India., Rajakilpakkam.
A – AVAILABLE B – BOOKED
|
DOORS WINDOWS VENTILATORS |
|
|
LIVING DINING BED ROOMS CAR PARKING
|
|
|
FLOORING PLATFORM SINK LOFT SHELVES |
|
|
FLOORING WALLS |
|
|
FLOORING RAILING |
|
|
EWC IWC WASH BASIN |
|
|
SUMP OHT SEPTIC TANK BATH ROOMS KITCHEN SINK PARKING AREA |
|
|
INTERNAL EXTERNAL DOORS WINDOWS GRILLS |
|
All Wardrobes / Cupboards, Showcases & Shelves in all the rooms shall be provided with both sides polished Black Coloured Cudappa slabs to a maximum of 45 Sq. Ft. in 2BHK Flats & 60 Sq. Ft. in 3BHK Flats ( If any Additional quantity required beyond the provision will be charged Extra)
| ENTRANCE |
|
| DRAWING |
|
| DINING |
|
| ALL BED ROOMS |
|
| KITCHEN |
|
| ATTACHED TOILETS |
|
| COMMON TOILET & OUTSIDE WASH BASIN |
|
| SERVICE AREA |
|
| COMMON POINTS |
|
| SWITCHES & WIRES |
|
| ALL BED ROOMS |
|
| APT |
|
| CCP |
|
| BHK |
|
| UDS |
|
| RCC |
|
| CM |
|
| M.S |
|
| CP FITTINGS |
|
| CPVC PIPES |
|
| UPVC PIPES |
|
| S.W.R PIPES |
|
| FRP |
|
| PVC |
|
| EWC |
|
| IWC |
|
| ELCB |
|
| MCB |
|
| A |
|
| CMDA |
|
| CMWSSB |
|
| S.No. | Stages of work | Percentage |
|---|---|---|
| 1 | While entering into Agreement | 20% |
| 2 | While Registration of UDS of Land / Plot | 30% |
| 3 | When Foundation work commenced | 10% |
| 4 | When RCC roof slab of Stilt Floor / GF of house is laid | 10% |
| 5 | When RCC roof slab of respective Floor is laid | 10% |
| 6 | When Brick Work in respective Flat / House is commenced | 10% |
| 7 | When Painting Work in respective Flat / house is commenced | 5% |
| 8 | When flooring in respective Flat / house is commenced | 5% |